Project Excel Files

This project provides a project scenario to complete via an Excel spreadsheet. Includes two data sets and questions to answer for both data sets. This project requires you to use several analytical tools to arrange, display and analyze data. Directions Download and review the following files: Project Excel file for completing this project: LG415_Course_Project.xlsxPreview the document Additional project information you will need to know in order to create the charts and perform the analyses correctly: LG415_Project_Additional_Info.docxPreview the document Review the following for more information about creating X-bar and R and S Control Charts in Excel: How to Create X and R Charts in Excel (Links to an external site.) Shewhart X-bar and R and S Control Charts (Links to an external site.) Read the following scenario to begin and complete the steps below. Scenario You are the Quality Manager for Widgets, Inc. You have just won a contract to produce a specialized widget that the customer requires a very tight specification limit. This widget is to be 5.50” in length, plus or minus .50”. This gives the total specification limit of 5.00” to 6.00”. You have set up the production line to produce a test run of the widgets (Data Set 1). The sample size consists of a total of 20 samples per run, with a total of four (4) runs. A total of 80 samples will be used to determine if the process is capable of producing the widgets within specification. Due to the specifications of the customer, and the setup of the manufacturing processes, the systematic random sampling technique was used to ensure that samples from each run were collected at the same point in time on different days. This provides the basis for the X-bar chart to group the sample from each run into logical subgroups. Perform the following for: Data Set 1 Date Set 2 X-Bar Charts Requirements Calculate the subgroup mean for each numbered sample Calculate the grand mean and standard deviation of the subgroup samples Calculate the UCL and LCL of the grouped samples Create the X-bar chart Provide detailed analysis of the X-bar chart IM Chart Requirements To ensure that the process in actually producing individual widgets within specification limits, you have decided to use an Individual Measurement chart that will plot each of the 80 samples against a calculated UCL and LCL, as well as plotting the data against the customer specification limits. Stack the sample data (place the run data into a single column. Run 1 first, Run 2 second, etc) Using the Data Analysis Toolpak, create the Descriptive Statistics for the stacked data Using the Descriptive Statistics output, calculate the UCL and LCL Create the IM chart using the calculated UCL and LCL Recopy the stacked data, and enter the customer specification limits Create the IM chart of the sample data against the customer specifications Provide a detailed analysis of both IM charts Answer Questions for Data Sets Answer the questions on the “Questions DS 1 or DS 2” tab on the spreadsheet, and follow the instructions.

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more